| By Jim
Tucker
The
Teacherage's new air conditioner keeps the inside air cool and
dry for interior painters while the carpenters and outside prep
crews do their sawing, hammering and scraping in the summer
heat.
The reconstruction work heads for completion in
November on both the Teacherage and Dishong-Bowen house.

|
Douglas Toth measures each piece of new siding on
the Dishong-Bowen house. The new siding recreates the clapboard look
of the original.
Both buildings blend into one with the addition of connecting,
protected structure.
Dishgong-Bowen has new siding and impact resistant
glass to go with it’s new foundation, frame, floors, walls and roof.
|
Chris Chilly, with his shadow helper, hand scrapes
away old paint from the Teacherage's eaves.
More Pictures
On Page 5
(Printed
Edition) |